Neutral Host Requirements: Pt 2 Hosted RAN high-level design

Document number: SCF245

Tags:  
Focus:

SCF245 Neutral host requirements part 2: Hosted RAN high-level design, aims to globalize and build on the ground-breaking work initiated by the UK’s MNOs’ Joint Operator Technical Specification for Neutral Host In-Building (JOTS NHIB). However Hosted RAN is applicable for a range of tenants not just Mobile Network Operators, but also private network operators, MVNOs and enterprises, and is for indoor and outdoor coverage.

Download PDF →

Please note : download and use of this document is subject to these Terms and Conditions.

Versions

Date Version Release
2022-06-29 SCF245.10.01 10
Back to all documents